Project Comments |
 |
Installation of parallel 60kVA UPS systems to give system power resillience. |
 |
Automated controlled shutdown of the universities server equipment. |
 |
Rationalisation of the mains supplies to the building and to its distribution systems to allow the introduction of the new electrical loadings. |
 |
Installation of dual distribution and final circuit arrangements to minimise the possible risk of supply failure due to individual components. |
 |
Installation of UPS bypass facilities and connection for temporary generation plant in the event of long term mains failures. |